Services

Five kinds of projects, each handled by one team from the first walkthrough through permits, construction, and the final punch list.

New home builds

A ground-up home on your lot, with design, engineering, permits, and construction under one contract.

What's included

  • Site review, survey, and soils report coordination
  • Architectural plans and structural engineering
  • Plan check, permits, and every inspection
  • Foundation, framing, roofing, and all systems
  • Energy code (Title 24) compliance and finishes throughout

Good to know

  • Hillside lots often need deeper foundations or retaining walls, which add cost before the house goes up.
  • If there's a house on the lot now, demolition is priced as its own line item.
  • Plan check for a new home can take months, so design and permits start well before construction.
  • Typical timeline[X to Y months, plus permits]
  • Often paired withAn ADU on the same lot

Kitchen remodels

From new cabinets and counters in the same footprint to taking out a wall and starting over.

What's included

  • Layout planning, including moving or removing walls
  • Cabinets, counters, backsplash, and flooring
  • Plumbing, gas, and electrical moved or brought up to code
  • Lighting, ventilation, and appliance installation
  • Permits and inspections

Good to know

  • Moving the sink or range changes the price more than almost any finish choice.
  • Custom cabinets can take weeks to arrive, so we lock in selections before demolition starts.
  • Most kitchen remodels need a permit, especially when walls, plumbing, or circuits change.
  • Typical timeline[X to Y weeks]
  • Often paired withOpening up the living or dining room

Bathroom remodels

Powder rooms, hall baths, and primary suites, taken down to the studs and rebuilt to last.

What's included

  • Demolition down to the studs and subfloor
  • Waterproofing behind every wet wall and under the shower
  • Tile, vanity, fixtures, and shower glass
  • Lighting, exhaust fan, and outlets to code
  • Permits and inspections

Good to know

  • Waterproofing is the part you never see and the part that matters most. We don't skip or shortcut it.
  • Converting a tub to a walk-in shower is one of the most common requests, and usually fits the existing plumbing.
  • Older homes often have damage hiding under the old tile. We price for it in writing if we find it.
  • Typical timeline[X to Y weeks]
  • Often paired withUpdating a second bathroom at the same time

Whole-home remodels

Every room updated under one plan, one schedule, and one budget, instead of one project at a time.

What's included

  • Floor plan changes, including load-bearing walls with engineering
  • Kitchen and bathrooms
  • Flooring, doors, trim, and paint throughout
  • Electrical, plumbing, and HVAC updates
  • Windows, insulation, and energy code (Title 24) requirements

Good to know

  • Doing everything at once usually costs less than the same work spread over several years.
  • Most families move out for at least part of the job. We'll tell you which phases are livable.
  • Older Hollywood homes often need updated wiring or plumbing once the walls are open.
  • Typical timeline[X to Y months]
  • PricingQuoted after a walkthrough
  • Often paired withA rear or second-story addition

Additions and ADUs

More room without moving: a new bedroom or family room, a second story, or a separate unit in the backyard.

What's included

  • Plans, structural engineering, and city plan check
  • Foundation, framing, and roof tie-in to the existing house
  • Siding, windows, and rooflines matched to what you have
  • ADUs: a full kitchen, bathroom, and utilities, detached or as a garage conversion
  • Inspections through final sign-off

Good to know

  • California law allows an ADU on most single-family lots, and many garages can be converted.
  • Hollywood and most of the San Fernando Valley permit through the City of Los Angeles. West Hollywood has its own building department and rules.
  • Plan check often takes longer than the build itself, so we start permits as early as possible.
  • Typical timeline[X to Y months, plus permits]
  • Often paired withA kitchen or bath update in the main house

Not sure which one fits?

Tell us what you'd like to change and we'll set up a walkthrough.

Request a quote